Fifty alderpeople, fifty slices of the city. Search by name or neighborhood, shade the map by what you care about, and open any ward for its full dashboard — or look up your address to find yours.
Live from the Chicago Data Portal (crimes, 311, building permits, business licenses, traffic crashes, ward offices), refreshed hourly. Ranks compare all 50 wards; 1st is the highest value, which isn’t always the worst. Crashes, Divvy docks and affordable units are assigned to wards by their coordinates. Last-month bars are hatched because the month isn’t over.
Ward 26 at a glance
Crime is up 15% on the same point last year, and the ward is middle of the pack (20th of 50) for crimes per square mile.
$26.5MDec 10, 20251539 N Pulaski RdNew Constructiondds 2019: full building permit for 6 story 61 dwellling unit apartment building connected to existing 2 story building with 26 parking spaces. (occupancy group b, r2; type iia construction) consultant reviewer: v3 companies of il
$5.5MAug 7, 20261033 N Christiana AveNew Constructiondds 2019 cbc dds 2019 cbc: full building permit for 5 story 40 d.u. building with basement, 21 car garage at 1st floor, 3 exterior parking spaces on concrete pad, deck at 2nd story over portion of garage, deck at 1st thru 5th story, balcony at 3rd thru 5th story, rooftop stair enclosure, elevator over-run, 1 exterior loading berth, entire building sprinklered, 6' high masonry trash enclosure, 40 on-site bicycle parking spaces as per plan (occupancy group r-2, s-2, type iiia construction). consultant reviewer: v3 companies of il
$2.9MFeb 17, 20261841 N Springfield AveRenovation/Alteration
Crimes by month, 25 months
341Sep 2026· ▲ 14% vs Sep 2025· average ward 393
454
Oct 2024Ward 26Average wardOct 2026
Most reported, 2026 · vs 2025
Battery58020%▲ 9%
Theft56920%▲ 1%
Criminal Damage31911%▲ 19%
Burglary28310%▲ 183%
Assault28310%▲ 6%
Other Offense2599%▲ 13%
Motor Vehicle Theft2469%▲ 25%
When incidents happen · last 12 months
Busiest: Sat 12a–1a · 46 incidents · 1.2% of the year
sc 2019 cbrc: full roof replacement for a 3-story, 83,071 sf elementary school. (occupancy group e-1; type iia construction)
$2.5MJul 28, 20261711 N California AveRenovation/Alterationspr 2019 cbrc: cps bernhard moos es - playground replacement, new turf field, new sport fields, new ornamental fence and pedestrian gates, and plant material. electrical work: adding security cameras, and conduit&wire to the existign mdf room. no change in existing occupancy (e-1, elementary school) and construction type (i-b).
$2MNov 4, 20253320 W Hirsch StRenovation/Alterationspr 2019 cbrc: replace existing playground, and parking at cps lowell. exterior improvements only, no interior scope of work. occupancy group e-1 (to remain), type iii-a construction, sprinklered (to remain).
$1.8MMar 25, 20263616 W Armitage AveRenovation/Alterationsc 2019 cbc: full building permit for a full roof replacement for a 4-story 76,262sf elementary school building. (occupancy group e-1; type iiib construction)
$1.7MOct 9, 20263625 W Dickens AveRenovation/Alterationspr 2019 cbrc interior alterations to the 3 story, 34 dwelling unt type iiia masonry building, as per plans. r2 occupancy classification.
$1.5MSep 10, 20264019 W North AveRenovation/Alterationtaqueria huentain interior and exterior renovations to an existing restaurant. type iiib construction.