Fifty alderpeople, fifty slices of the city. Search by name or neighborhood, shade the map by what you care about, and open any ward for its full dashboard — or look up your address to find yours.
Live from the Chicago Data Portal (crimes, 311, building permits, business licenses, traffic crashes, ward offices), refreshed hourly. Ranks compare all 50 wards; 1st is the highest value, which isn’t always the worst. Crashes, Divvy docks and affordable units are assigned to wards by their coordinates. Last-month bars are hatched because the month isn’t over.
Ward 47 at a glance
Crime is down 4% on the same point last year, and the ward is 15th-lowest of 50 for crimes per square mile.
$36MAug 14, 20263959 N Lincoln AveRenovation/Alterationdds 2019 cbrc: adaptive reuse of an existing 5 story commercial building to multi-family residential with a new 5 story addition. occupancy groups b, m, r-2, s-1,s-2,u; construction type: iia; consultant reviewer: v3 companies of illinois
$30MApr 21, 20263348 N Campbell AveRenovation/Alterationdds 2019 cbc: addition of a 2-story athletic facility to existing school building to build indoor competition and practice gymnasiums with associated locker rooms and 25 additional outdoor parking spaces (occupancy groups a-3, a-4, b, s-2; type ib construction) consultant reviewer:v3 companies of il
$15.6MAug 7, 20262406 W Eastwood AveRenovation/Alterationdds cbc 2019: existing 4 story structure to receive a 6 story addition to the south for a 73-unit residential development with ground floor retail space and enclosed parking. separate caisson is under #101053350 .occupancy: r-2, m, s-2, construction type: iia. all as per plans.consultant reviewer: v3 companies of il
Crimes by month, 25 months
174Sep 2026· ▼ 31% vs Sep 2025· average ward 393
454
Oct 2024Ward 47Average wardOct 2026
Most reported, 2026 · vs 2025
Theft65938%▲ 5%
Deceptive Practice20312%▼ 14%
Battery19311%▼ 4%
Criminal Damage17010%▼ 25%
Burglary1609%▲ 4%
Assault1167%▲ 10%
Other Offense996%▲ 2%
When incidents happen · last 12 months
Busiest: Fri 12p–1p · 33 incidents · 1.4% of the year
$7.7MAug 11, 20264909 N Glenwood AveRenovation/Alterationspr 2019 cbrc: interior & exterior renovations w/ fire damaged stairs replacement (same size and location) to (24) fire-damaged d.u. on existing 4-story (38) d.u. masonry bldg; construction type iii-a, occupancy group r-2. *certified plan corrections*
$7.3MJan 8, 20262324 W Irving Park RdRenovation/Alterationdds / 2019 cbrc: interior alterations to existing 5-story residential building (104 dwelling units) to include exterior ada upgrades & new pergola as per plans.(occupancy group: r-2 / type 1a construction) consultant reviewer: globetrotters engineering
$4MApr 20, 20261650 W Cornelia AveRenovation/Alterationself cert 2019 cbrc: scope for boiler replacement and air handling unit replacement. includes installation of new return fan in attic, new roof dormer to allow return air duct to exit attic, run down exterior of building, and re-enter at basement mechanical room where a new built-up air handling unit to be installed. also includes replacing existing steam boilers and heating components with new condensing hot water boilers and heating components. new fire pump, controller and meter replacement is included in scope of work. new fire rated condit is included from fire pump room to comed. replacement of select existing distribution, branch panelboards and ats. existing trash enclosure will be demolished to facilitate construction; new trash enclosure to be provided. occupancy group e; four-story building; type iiia construction.
$2.9MApr 23, 20262145 W Bradley PlNew Constructionproposed 2 story sfr w/basement and attic, 2nd floor roof deck, rear patio, pool, pergola/trellis, 6' wood fence, and attached 3 car garage, per plans. administrative adjustment #26-089 to reduce the required front setback approved 04.21.2026.
$2.2MOct 7, 20262353 W Byron StNew Constructiondds 2019 cbc: full building permit for 5 story 8 d.u. building with basement, 1st floor retail, 8 car garage at 1st floor, deck over portion of garage at 2nd story, rear balcony at 2nd thru 5th story, deck at 2nd thru 5th story, rooftop deck, rooftop stair enclosures, elevator over-run, entire building sprinklered, 8 on-site bicycle parking spaces & a trash storage area at 1st floor as per plans (occupancy group r-2, s-2, m, type iiia construction)consultant v3 companies of il